Ormbacka Skälby 3533

Control & Monitoring Contract (SÖE) in New Construction

Project typeNew construction
Contract formDesign-build (ABT06)
Contract periodMar 2026 – May 2026
CertificationMiljöbyggnad 4.0 Silver
Heat productionHeat pumps

About

Skälby 3:533 – Ormbacka is a new construction project comprising three different housing types: an apartment building, terraced houses and semi-detached houses. The project is being built to Miljöbyggnad 4.0 requirements, rating Silver, along with high and verifiable energy performance across the entire property portfolio.

Heat is produced using different types of heat pumps depending on housing type – exhaust air heat pumps in the terraced and semi-detached houses, an air-to-water heat pump in the apartment building – which requires a control and monitoring system able to collect, present and alarm on data from all facilities in a unified way.

Scope of Contract (Controls, SÖE/SÖ)

Cubus Verde was responsible, as a subcontractor to Clarity, for the control and monitoring contract (SÖE) in the new construction at Skälby 3:533. The heat pump system in the apartment building is controlled via a MELbus Heating control box. Cubus Verde supplied a new control cabinet and a new PLC, which was programmed, installed and commissioned.

The Solution

To achieve Miljöbyggnad Silver, requirements were also set for data collection, trend logging and alarm management. Cubus Verde therefore delivered a local HMI (Webport) providing:

1COP & SCOP monitoring:

Automatic calculation and monitoring of COP and monthly SCOP for the heat pumps, including electric peak load

2Trend logging:

Trend logging of all signals in real time and historically, with selectable resolution and time period

3Alarm management:

Alarm management in three priority classes (A/B/C) with distribution via email and SMS according to a schedule

4Data backup:

Scheduled or manual backup of historical data (trends, consumption, alarms) locally and to an external server

Cubus Verde’s Role

The assignment was carried out as a design-build contract under ABT06, with Cavada AB as client and main contractor, and Clarity as the contracted contractor. Cubus Verde was responsible, as a subcontractor to Clarity, for the delivery, programming and commissioning of the control and monitoring contract to a fully functional, operational facility.

Project Parties

Client & main contractor: Cavada AB

Contracted contractor: Clarity AB

Controls (SÖE): Cubus Verde