Defrost is a normal part of operation for many air-source heat pump systems.
The more interesting question is what the rest of the heating system does while it is happening.
During defrost, temperatures and available heating capacity can change temporarily. At the same time, the heat pump may be running its own internal control sequence while the building automation is managing heating demand and any additional heat source.
That creates an important interface:
Which controller decides when additional heat may start?
There is no universal answer. It depends on the system design, heat source, hydraulic arrangement and the control strategy.
But the boundary should be deliberate.
The release of additional heat should be based on defined operating conditions rather than an unintended reaction to a temporary event elsewhere in the system.
And the interaction should be verified in real operation.
Trend data can show heat-pump status, relevant temperatures, operating modes and additional-heat operation on the same timeline. That makes it much easier to see whether the complete sequence behaves as intended.
At Cubus Verde, we treat these interfaces as part of the control strategy, not as something left for two independent controllers to negotiate by accident.
Define the boundary. Then verify the sequence.