November 5, 2026

Gröna Lunds Förskola

Control & monitoring delivery with E&E Ventilation

Scope1 property
~580 m²
ContractABT06
LocationEkerö, Sweden
Property OwnerEkerö Kommun
Client segmentHVAC contractor

About

Gröna Lunds förskola (approx. 580 sqm GFA, built in 1989) is a single-storey building with plant space in the attic. The preschool has capacity for approximately 58 children across 3 departments and is situated within an existing residential area, centrally in the town of Ekerö.

For a preschool, a healthy indoor climate is of particular importance. Children spend a large part of their day indoors and are more sensitive than adults to poor air quality, temperature variations and draughts. Reliable control of ventilation and heating creates a better environment for play and learning, while giving the property owner better control of energy use and operation.

The Assignment

Cubus Verde supplied and installed a new control cabinet with a new operator panel, and programmed and commissioned a new PLC. The system was connected to Ekerö Municipality’s SCADA and all the external components were replaced or supplemented with new ones.

The assignment was carried out as part of a collaborative project, with Ekerö Municipality as client, SSEA as main contractor, and E&E Ventilation as the contracted contractor to Cubus Verde. Cubus Verde was responsible, as a subcontractor to E&E Ventilation, for the delivery and installation of the control and monitoring contract to a fully functional, operational facility.

Keeping to schedule and budget, and contributing proactive improvement proposals that strengthen both the delivery and the project economy, is one of the cornerstones of collaborative contracting. Changes were handled promptly throughout, and the project progressed according to plan without delays.

The Collaboration

E&E Ventilation describes the collaboration with Cubus Verde

Excellence:

Excellence in Every Action

“We experienced the quality of the delivery and execution as excellent. The work was characterised by high competence, accuracy and a professional approach throughout the project. The management of the entire project helped keep it on schedule and without delays.”

Partnership:

Success Through Collaborative Partnerships

“The collaboration and communication with Cubus Verde were very good throughout the project. The dialogue was clear, constructive and solution-oriented, and it was easy to keep an open dialogue through every stage. Their presence and management of the entire project contributed directly to the result.”

Innovation:

Leading Change Through Creative Innovation

“Definitely, Cubus Verde contributed ideas and solutions that improved the project. What stood out was their commitment throughout the entire project phase and their proactive proposals whenever changes arose.”

Would E&E Ventilation recommend Cubus Verde?

Yes, because everything went so smoothly. They handled every part of the project professionally and correctly, and always on time, which is somewhat unusual in the industry.

Emir Jasarevic, Owner, E&E Ventilation

In three words: Solution-oriented · Committed · Constructive

SSEA describes the collaboration with Cubus Verde

“High-quality execution, professional and competent staff with proactive and ongoing communication and feedback throughout.”

Mikael Åman, Installation Coordinator, SSEA

Project Partners

Ekerö Kommun
SSEA
E&E Ventilation

Related Content

Apply Now

Cubus Verde is where innovation meets opportunity. If you’re passionate about technology, driven by excellence, and excited about the possibilities that come with working in a fast-growing industry, we want to hear from you. Join us and be a part of something transformative!